A photograph of finished tables may show that furniture exists. It does not establish which order it belongs to, whether agreed inspection is complete or whether it has left the factory. Before a payment review, identify the event stated in the agreement and collect evidence for that event.

Write the agreed event in ordinary words
Keep the original agreed wording and ask the relevant parties to clarify any ambiguity. “Ready” might mean assembled, inspected, packed or available for collection. Those conditions need separate evidence. Do not rewrite the payment obligation or set a new percentage through an internal checklist.
Name the affected order lines and quantities. If only one group is presented, the record should not imply completion of the whole order. Specify who prepares each document, who checks it and who has authority to decide the next action under the actual agreement.
Match the document to what it can establish
The US International Trade Administration distinguishes pro forma and commercial invoices in its export-document guidance. A document’s name and purpose matter; an invoice is not a substitute for furniture-specific inspection evidence.
The trapezoid-base bamboo table has two open frame supports under a rectangular top. An overall image can identify that design direction. It cannot establish underside connections, the entire lot, packed quantity or transport status unless the relevant evidence is separately provided.
| Event to verify | Possible relevant record | Do not infer |
|---|---|---|
| Production completion | Identified order lines and completed quantity | Whole order complete from one photograph |
| Agreed inspection | Report scope and open findings | Dispatch or every-item inspection |
| Dispatch | Applicable transport handover evidence | Arrival or installed condition |
| Installation | Location-linked completion and exception record | All commercial matters settled |
Reconcile partial quantities and unresolved findings
Use one line reference across the invoice request, completion record, inspection scope and any dispatch documents. Mark quantities outside the evidence set. Keep a reported correction separate from verified reinspection, and ask the authorized reviewer how open findings affect the agreed milestone.
For an illustrative order with tables ready and chairs still in progress, do not label the whole order “completed” merely because the largest items are photographed. Equally, do not invent a right to withhold or split payment. Record the mismatch and route it to the parties responsible for the commercial decision.
Keep procurement review separate from bank requirements
Where a letter of credit or another bank-handled arrangement is used, the document requirements need review with the bank and appropriate trade professionals. The ITA letter-of-credit guidance emphasizes preparation of the required documents and correction of discrepancies. An internal furniture checklist does not amend those requirements or guarantee payment protection.
For a project-documentation enquiry, send the item schedule, existing milestone wording and evidence requested by your project team. The production-lot inspection guide defines an inspection brief separately. No payment ratio, credit recommendation or legal conclusion is supplied here.